Add to Cart
1. Positioning holes are placed every 600mm in centers for easy installation and positive positioning of 1200 structural tees to
perimeter angle.
2. The T bolt will be inserted into the positioning holes and then fix the 3600 main runner and the 1200 structural tees with the
connectors
Material: AL 6005
Epoxy surface to 80um
Positioning hole spacing 600mm
Concerntrated load ≥1720N